The Los Angeles Department of Water and Power will now deploy grid-scale batteries just like other utilities in the region, and has finalized a collaboration with Doosan GridTech and KTY Engineering to that end.
The first battery energy storage system for the utilization of the Mojave Desert’s solar generation is a massive step forward as the LADWP approved procurement of a 20-megawatt/10-megawatt-hour lithium-ion system to go into the Beacon Solar Plant in the desert.
Greentech MediaWhy not share this article?